Monday, August 20, 2012

Work Trip Pictures (from Aug. 18, 2012) - Sec. 3 Crew


Oriental Bittersweet, an invasive plant of concern because it grows vigorously and smothers vegetation, resulting in excessive shading.  It is abundant in this section of the trail.  It can also hybridize with a native variety of bittersweet. (Photo & caption: Christina W.)



Sec. 3 Work Crew(s) -
Section 3 is the 1.4 mile stretch of AT just north of the Paul C. Wolfe Shelter. The folks working on this section split into two crews and were sidehilling and putting in erosion control features.

Following photos: Christina W.

Some well-worn tools of the trade!

Left: Digging a new waterbar
Right: Finished waterbar - water will divert off to the left in the ditch.


Left: A nice stretch of sidehilling to restore the tread width
Right: Leaves scattered on raw dirt make the rehabbed tread look less 'new'


Grass Spider (Agelenopsis pennsylvanica)  An ambush predator who constructs a non-sticky web with a retreat tunnel.  When insect prey are captured, they are hauled back to the interior of the web. (Photo & caption: Christina W.) 



Following photos: Lori A.












Left: Sidehilling in progress
Right: A long section of tread that has been sidehilled













Left: Scattering leaves on the finished tread rehab project.
Right: The rehabbed section of trail, hiker-friendly once more.


Relaxing at the Shelter after a hard day of sidehilling and before the 2.5 mile hike UP the mountain (with all the tools) and out to the HB Parking Lot and then on to the toolshed.









No comments:

Post a Comment