AT corridor boundary monument 35
Old Dominion Appalachian Trail Club (ODATC) is one of only 31 AT maintaining clubs. These clubs are responsible for the entire 2,000+ miles of AT from Springer Mountain, Georgia to Mt. Katahdin in Baxter State Park, Maine. Most of the club members are probably aware of the 'regular' maintaining of the AT that goes on by the club maintainers/sawyers/volunteers such as removing blowdowns, installing waterbars and keeping them operable, building rock steps or other rock projects, weed whipping, and generally keeping the AT clear and in good shape for all the hikers that use it.
Another maintaining activity, one that is probably not as well known, is monitoring the AT Corridor Boundary lines. This is an off-trail activity and requires bushwhacking and navigating through some rough terrain. You must be physically fit to do this, have an adventurous spirit, and love being in the mountains/woods where you will see all sorts of beautiful, often interesting and sometimes strange sights as you locate/check out the monuments that mark the corridor and look for boundary line encroachments or other issues.
So what is Corridor Boundary Monitoring specifically? The following information is from the AT Corridor Stewardship Field Book (A Guide to Corridor Monitoring and Boundary Maintenance for Volunteers):
Corridor monitoring is the systematic gathering and reporting of information about the corridor and its boundaries through periodic on-the-ground inspections. (Monitoring Task Force 1983)
Despite being a lesser known side of trail work, it is important for all of those involved with trail management to recognize that a successfully run corridor monitoring program at the club level provides the primary line of defense in protecting the corridor. Monitoring is the first step in identifying problem areas and planning remedial actions to protect the investment in both the land base and the surveyed boundary line.
With the signing of the "Delegation Agreement" between ATC and NPS in 1984, corridor monitoring became a responsibility of all local Trail clubs having NPS acquired corridor lands within their respective Trail Sections .
Local Trail Club Roles
Monitor Coordinator
The monitor coordinator (note: for ODATC this is the "Land Management" board position) is responsible for designing and implementing the club's corridor monitoring program. These responsibilities include:
- Ensuring to ATC and NPS that the club fulfills its corridor monitoring duties.
- Recruiting and training volunteers to serve as corridor monitors.
- Dividing the club's corridor into reasonably sized monitoring sections.
- Determining the frequency for each section to be monitored.
- Coordinating follow-up of any encroachments or other corridor related problems.
- Preparing and submitting to ATC by February 15 the required annual summary report of corridor monitoring activity for the previous calendar year.
Corridor Monitors
Corridor Monitors gather and report information about their assigned sections of the corridor and its boundaries through periodic on-the-the ground inspections. Their responsibilities include:
- Regularly walking the boundary of their corridor section to ensure a consistent watchful presence in the eyes of both adjacent landowners and the general public.
- Locating monuments, reference trees, and line trees.
- Documenting & reporting to the monitor coordinator the existing boundary conditions, such as faded survey blazes, excessive overgrowth along the boundary, lack of U.S. Boundary signs, missing reference trees, and conditions of monuments.
- Documenting and reporting to the monitor coordinator and ATC signs of inappropriate use, external threats, or other types of corridor misuse.
- Providing an accessible point of contact to adjacent landowners who may have questions or concerns about the corridor.
- Working with the local trail club, ATC, and/or NPS (in more serious trespass situations) to mitigate discovered problems.
From ODATC's website(under the 'Stewardship' tab) and the link Land Management, this information applies specifically to the club's boundary monitoring responsibility:
The ODATC monitors and maintains 162 survey monuments and the approximately 15
miles of NPS boundary they define as part of the protective buffer on both the
east and west sides of the AT corridor for those portions of the AT in our
region of responsibility (Reed's Gap to Rockfish gap) that run east of the Blue
Ridge Parkway.
For a map of all the monuments monitored by ODATC (you can zoom in to see the actual monument numbers):
☼☼☼
Note: Published April 6 on R2R: A Day Out On The Line by David Wilcox. This is the actual account of Dave (a Corridor Monitor) & his crew, out monitoring a boundary line segment on March 21, 2013.
☼☼☼
| ![]() |
Area in which Monument 35A is located.
| ![]() |
Monument 35A
|
|
|
|
Monuments 35B, 35C, 35D, 35E
☼☼☼
☼☼☼
Monument 36 & two members of the monitoring crew
|
|
|
Monuments 36A, 36B, 36C
☼☼☼
☼☼☼
| ![]() |

![35A Region [2]](http://farm9.staticflickr.com/8327/8431002543_31cf276ff6_m.jpg)
![35A Region [1]](http://farm9.staticflickr.com/8360/8432086654_c9de198259_m.jpg)
![35A [1]](http://farm9.staticflickr.com/8515/8431006097_b3be84628b_m.jpg)
![35A [2]](http://farm9.staticflickr.com/8494/8431005287_6ac063fd79_m.jpg)








![37A [1]](http://farm9.staticflickr.com/8183/8432076642_7b37ba2188_m.jpg)
![37A [2]](http://farm9.staticflickr.com/8496/8432074376_0ff1618675_m.jpg)




![38D [2]](http://farm9.staticflickr.com/8090/8432071926_52e9d4eae0_m.jpg)


Many thanks Merlot for the "Corridor Boundary Monitoring" post! And kudos to those who do the monitoring over the rough terrain. It makes what we trail maintainers do seem easy by comparison.
ReplyDelete