Monday, March 25, 2013

Volunteer Day at Presquile NWR (March 23, 2013)


DSCN0324
The Good Ship JRA on the James River
Captain Mike & the crew aboard!

Saturday turned out to be a perfect day for working on one of our favorite non-AT projects: helping Cyrus B. at Presquile NWR. This was 'Volunteer Day' so other groups besides our own (numbering 20!) were also involved. A total of 34 volunteers and the crew of the James River Association's 40 x 12 foot boat gathered at the ferry dock across from Presquile, signed in and loaded up for the trip up the shipping channel and around to the dock on the island.

Once on Presquile, Cyrus quickly got us organized into groups for various projects he had planned. The James River Ecology School has its grand opening on April 13 so there was a lot of work and "sprucing up" to be done. Everybody stayed very busy until lunch and then it was back to work for another hour or so, wrapping up projects and packing up gear for the trip back to the mainland.  I took over a hundred pictures - no way I can get them all on this post; however, I will let the ones below tell a good portion of the story as to what was accomplished (with the help of a few captions), but you really had to be there to truly appreciate all of the work that was happening around Presquile on Saturday.


Meeting at the ferry dock and getting signed in before loading on the boat:

DSCN0222DSCN0220DSCN0219


Our boat ride, docked at Presquile and the walkway up from the dock:

DSCN0296DSCN0300

Everyone gathers so Cyrus can organize the groups for the day:

DSCN0225


Project 1 and Priority #1 - get all the new bunk beds for the bunk house assembled:

DSCN0257DSCN0254
A view of the new bunkhouse & the pile of mattresses on the screen porch that will go on the new bunk beds. 

DSCN0251DSCN0252DSCN0253
Crews busy putting together the bunk beds .... assembly was definitely required!

DSCN0284DSCN0285
Completed bunk beds, mattresses in place .... which also means a clean screen porch with a view!


Project 2 - Sawyer crews and volunteers (aka 'swampers') cleared downed trees, debris and brush piles:

DSCN0246DSCN0248

DSCN0243DSCN0244DSCN0245

DSCN0311DSCN0313

DSCN0315
Heavy equipment helped move the larger pieces of debris and tree trunks, but most of the work during the day was good old-fashioned "volunteer power". 

DSCN0278DSCN0280
The area is well on its way to being cleaned up after all the work put in by the sawyers and the volunteers on this project.


Project 3 - take the protective tubes off of the trees that have gotten big enough to not need them any more. Tubes removed were sorted into those that were too damaged to be reused (split by growing trees) and those that could be used again.

DSCN0227
Some crew members taking the tubes off the trees - they had about 15 acres to cover!


DSCN0268DSCN0293
Since the only truck on Presquile was busy hauling tree debris, a little ingenuity was used to help carry tree tubes out of the field and back to the equipment shed.


Project 4 - getting a base coat of paint on several sheds and fixing the doors on one shed:

DSCN0240DSCN0288
New doors on the shed ..... and paint going on.


DSCN0305
A second building with a painting crew hard at work.


Project 5 - clean up and organize the equipment shed:

DSCN0229DSCN0232
Before: piles of tree tubes and stakes in multiple places around the equipment shed, plus lots of trash and debris.

DSCN0234DSCN0267
After: tree tubes are now neatly stacked & stakes organized in buckets, plus a whole lot of trash has been removed.


DSCN0265DSCN0266
Captain Mike (on the right) helped out with the cleanup and a view of one of the large piles of trash from the shed, ready to be hauled away or recycled.


Lunch - as one happy volunteer commented "lunch was first class!"

DSCN0262
Cyrus grilling the hamburgers & veggie burgers.


DSCN0261DSCN0273DSCN0276
A view of hamburgers on the grill and the buffet which included hamburgers & buns, crab meat (to make Chesapeake Bay burgers), cheese, macaroni salad, potato chips, condiments & for dessert, chocolate pecan pie!


DSCN0275DSCN0274
The buffet line in progress and folks eating out on the back deck in the sunshine .... there was also seating inside.


DSCN0281
Finishing up lunch and getting ready to head back out to wrap up projects.


DSCN0297DSCN0298
Views of the James River from the dock at Presquile NWR.


DSCN0319DSCN0318DSCN0317
Crews leaving Presquile; a view of the control console on our very nice ride; sharing the most exotic 'wildlife' find of the day - a baby Croc!

DSCN0322
Unloading at the ferry dock ..... back on the mainland.


DSCN0323DSCN0325
Reviewing the details of a very productive and successful day and saying last goodbyes.


As usual, it was another great trip to Presquile NWR!  Many thanks to the following:
  • Cyrus -  for once again making the day a most pleasant one for all the volunteers. We may have left tired and with sore muscles, but we were also still smiling (a lot)!
  • The JRA folks .... Captain Mike and the crew, for getting us safely to/from Presquile on their great boat & working on several of the projects with us.
  • All the volunteers who worked so hard .... a tremendous amount was accomplished this Saturday toward the goal of getting Presquile NWR in great shape for the grand opening on April 13!

If you would like to attend the Grand Opening:

For more information about specific event details, boat shuttle information, and to RSVP your attendance, please visit the James River Association or U.S. Fish and Wildlife Service websites at:
or


(All photos: Merlot)

♦ ♦ ♦

You have three choices for 'following' the RtoR Blog if you don't want to miss a post:
Email (sign up directly under the pageview number in the right sidebar)

Readers (ex. Google Reader - subscribe directly under the email signup)
Facebook ("Like" the RtoR Facebook Page - see tabs at top of blog post for "RtoR on Facebook" link)

No comments:

Post a Comment